Case Study - Tesco Extra, Slough, 2005
Section Links
 
Our Services
 

Office Development
Date: April 05
Project Duration: 15 months
Project Value: £2,800,000

 

This project consisted of two new buildings;
three storey open plan office blocks with an
open plan office space area of approximately
60,000 ft2 per floor. HSES designed, supplied
and installed mechanical services including four
pipe fan coil units, 20 air-handling units 4 gas fired boilers and 6 air-cooled chillers. The building was served by rainwater harvesting system.

 
 

KEY FACTS

 
  • 300,000 sq ft office accommodation
  • Two store car park with a mixture of natural and mechanical ventilation
  • Open plan offices with 4 pipe fan coil units and primary fresh air ductwork
  • Ventilation platforms at roof level housing 10 air handling units per building
  • Boiler room and chiller plantroom at roof level of each building
  • Rainwater harvesting tanks in basement car park to feed toilets
  • Above ground drainage, rain water pipe work, sanitaryware and all internal ductwork
 
 
Top
 
Awards & Trade AssociationsHealth & SafetyEnvironmentalEqual OpportunitiesTrainingQuality
Home | About Us | Our Services | Case Studies | Our Clients | Team Culture | Latest News | Contact Us
Awards & Trade Associations | Health & Safety | Environmental | Equal Opportunities | Training | Quality
© HS Environmental Services Limited. All rights reserved | email: enquiries@hsenvironmental.com | tel: 01708 331 100